How we compare
Review energy rates, included charges and contract terms together.
See live Texas rates for your ZIP. Fast. No signup. No obligation.
Voltcheckr LLCPUCT broker BR260102Broker disclosures
Business suppliers we shopAvailability varies by account.
A Texas business’s experience
“Voltcheckr was quick, easy and saved my business thousands!”
BasisProjected, not yet realized. Savings vary by account and market. Details of this projection in the customer story
Mike Owner, On the Rocks Italian Bistro
Burleson, Texas
YOUR NEXT STEP
Have the service address, meter and start date ready, or time a switch to your current end date.
Existing space checklist
Find the ESI ID on a bill for the address; Oncor's lookup confirms the site is on its lines.
Choose a supplier and start date. Your supplier sends Oncor the move-in order.
Ask the supplier about credit and deposit requirements before signing.
Review your current terms before choosing a new start date.
Find the end date, notice window and any early termination fee.
Have a recent bill and your ESI ID ready so the offer can be matched to your service address.
Review the new contract and confirm the service date before committing.
Credit review and deposit requirements vary by supplier.
Rates priced for your utility, your renewal month and, with a bill, your usage.
Fixed supply rates, each with its supplier, term and start month. The supplier's contract shows the full terms before you sign.
Pick an emailed rate and sign up on our site with your yearly usage or a recent bill (some plans need the bill). The supplier's contract then comes by email to sign.
Emails start about 90 days before your contract ends, or right away if it is closer, so you can renew before it rolls to a month-to-month rate that can cost more.
Rates in your inbox before you renew. Stop anytime.
Broker disclosure: Voltcheckr LLC is an independent energy broker (Texas PUCT Broker Registration BR260102), not an energy supplier, with no affiliated supplier. The supplier you choose pays us a commission that is included in your quoted rate, and you contract directly with that supplier. You can stop using Voltcheckr at any time at no cost. By continuing you acknowledge our broker disclosures.
The ESI ID is the 17-digit number on a bill for the address. Oncor's ESI ID lookup finds it and shows whether the location is in Oncor's service territory.
Oncor's new construction request starts the work, and a project manager contacts you within two business days. Oncor's commercial and industrial customer requirements list the load details the request needs, and its New Construction Management Center answers at 888-222-8045. The ESI ID comes when the site is ready, and Oncor installs the meter for the start date you select with your supplier, subject to construction and site access.
Oncor can reset an existing premise's demand ratchet after a permanent load reduction of at least half its peak billing demand, with the equipment removed and a load study by an independent registered professional engineer or master electrician. The request goes through your supplier and counts for future bills only, and Oncor reinstates the old ratchet if demand reaches 75% of the prior peak within 6 months.
Oncor's tariff lists Dallas among the cities it serves. The utility on your bill settles it for your address, and a business on Oncor's lines chooses its supplier.
Checked November 23, 2026.
Choose a supplier and give it the last 7 digits of the ESI ID. The supplier sends Oncor the move-in order for the start date you agree, and Oncor bills its delivery charges to the supplier, not to you.
For a new non-residential premise, Oncor sets the first delivery rate schedule from the projected load the customer or builder provides. Its commercial load requirements form asks for the service size in amps, the voltage and the HVAC, motor and lighting loads, usually completed with the electrical contractor. A supplier prices a site with no bills from projected energy use in kWh, and the usage estimator turns square footage and business type into that figure, labelled as an estimate. It does not replace the load details Oncor asks for.
A certificate of occupancy, which is separate from the electricity order.
Checked November 23, 2026.
Sources: Oncor, Existing Service Requests (the ESI ID lookup, the last 7 digits, the supplier's move-in order), New Construction (the request, a project manager within two business days, meters installed for the start date you select) and For Business (the 17-digit ESI ID, the New Construction Management Center); Oncor, Tariff for Retail Delivery Service, section 6.2.3.5 (the first rate schedule from projected load), and its Electric Demand Reset Verification form. Read October 10, 2026. Oncor, Commercial & Industrial Load Requirements form (the service amps, voltage and connected kW). Read November 25, 2026.
LARGER ENERGY NEEDS
Suppliers bid for your contract on the terms you set. We help you compare the custom prices.
For accounts over 100,000 kWh a year
Need help? Call (469) 708-9311
We review your application and help set your contract terms.
Receive custom prices from suppliers by email as they arrive.
Review the contract with us before you sign.
Eligibility review and authorization are required. Supplier participation varies.
BUSINESS ELECTRICITY
See rates, terms and what’s included, at the same usage.
See how your bill adds upBusinesses in Texas retail-choice areas can choose their electricity supplier. Available offers depend on your service address, usage and contract timing.
| Illustrative comparisonZIP 75201 | Example A12-month term | Example B24-month term |
|---|---|---|
| Fixed energy rate | 6.20¢/kWh | 6.45¢/kWh |
| Energy | $93.00 | $96.75 |
| Oncor delivery | $80.76 | $80.76 |
| Monthly utility charge | $6.70 | $6.70 |
| Illustrative monthly bill | $180.46 | $184.21 |
| Average price | 12.03¢/kWh | 12.28¢/kWh |
An Oncor account at 10 kW or less, before taxes. How an offer shows delivery differs by supplier, so ask us and we’ll check each offer.
Updated .
1,500 kWh per month. Example A: an illustrative bill of $180.46, or 12.03 cents per kWh. Example B: an illustrative bill of $184.21, or 12.28 cents per kWh. Before taxes and other account-specific charges.
UNDERSTAND YOUR COSTS
Energy, delivery and the monthly charge: Example A comes to about $180.46 at 1,500 kWh, before taxes and other account-specific charges.
Two parts: the energy rate from the supplier you choose, which you compare here, and Oncor’s delivery, about 5.38¢ per kWh plus $6.70 a month for accounts at 10 kW or less.
Cite as: Voltcheckr LLC, Oncor delivery charges for Dallas businesses at 10 kW or less (Oncor tariff, checked November 12, 2026), voltcheckr.com/business-electricity/dallas#dallas-bill-example.
Oncor bills delivery to your supplier, which includes it on your electricity bill. An offer may bundle delivery into its price or list it separately. This example adds the tariff charges below; the monthly charge is separate.
The $6.70 monthly charge includes a $2.34 customer charge and a $4.36 metering charge for one meter. Rider MG, billed in December only, and the credit for a meter Oncor does not own are excluded.
Current delivery charges. Actual pricing and delivery charges vary by account and market.
This example uses Oncor’s schedule for secondary-service accounts with demand of 10 kW or less, measured over the highest 15 minutes of the month.
A premise moves to Oncor’s larger schedule after a third recorded demand above 10 kW in a rolling 12 months, or one above 12 kW. It moves back only after 12 consecutive billing months at or under 10 kW. That schedule bills a $24.00 customer charge and a $20.99 metering charge a month. Its distribution charge is billed per kW, with an 80% ratchet and load factor bands above 20 kW. A monthly kWh total alone cannot price that bill; check the demand and service-class lines on your bill. A power factor under 95% lagging can raise billed kW.
For a premise that has reached 700 kW, transmission charges can depend on 4CP: its demand during ERCOT’s four summer peaks. This method does not apply to every account above 10 kW.
Multiply monthly usage by the energy and delivery rates, then add the monthly charge. Divide that amount by usage to get the estimated average price per kWh.
Delivery is calculated at 5.3843¢ per kWh. The 6.20¢ energy rate is an illustration, not a live supplier offer. Taxes and any other account-specific charges are excluded. Figures are rounded for display.
Your monthly bill changes with usage, even when the energy rate is fixed. Utility riders can also change when new tariff rates take effect.
Ancillary services, congestion and ERCOT fees may be included in the quoted price or passed through separately. The supplier’s contract identifies which charges are fixed, which can change and how they are calculated.
Taxes and other account-specific fees are excluded from this example. See the Texas business FAQ for answers to common electricity questions.
Example A, a 12-month fixed-rate example. Before taxes and other account-specific charges.
| Bill component | |||
|---|---|---|---|
| Energy | $93.00 | $186.00 | $310.00 |
| Utility delivery | $80.76 | $161.53 | $269.22 |
| Monthly utility charge | $6.70 | $6.70 | $6.70 |
| Illustrative monthly bill | $180.46 | $354.23 | $585.92 |
| Average price | 12.03¢/kWh | 11.81¢/kWh | 11.72¢/kWh |
Dallas electricity choice
If Oncor delivers to your address, you choose your supplier from those serving its area, and Oncor still delivers the power.
Options depend on your service address.
WHY VOLTCHECKR
Voltcheckr LLC is a Texas PUCT-registered electricity broker (BR260102) with no affiliated supplier.
Review energy rates, included charges and contract terms together.
Start with your ZIP, usage and contract timing.
Look at the energy rate, contract length and what’s included.
Continue online where available, or get help with an offer.
No separate fee. Your supplier pays us a commission that is included in your quoted rate.
How Voltcheckr is paid →We use your bill and usage to prepare your quote, and share them with suppliers only with your authorization. We never sell your data.
Our privacy policy →BY INDUSTRY
See what shapes electricity use in your industry.
BEFORE YOU CHOOSE
Rates, contracts and getting started.
Retail electric providers active in Oncor territory supply Dallas businesses on Oncor's lines. Suppliers we shop for Texas businesses include TXU Energy, Constellation Energy, NRG Energy, Shell Energy, Engie and NextEra Energy, among the 16 on our list. Availability varies by account, so a name on a list is not an offer: a ZIP lookup or one bill shows which offers match yours.
For a small business account at 10 kW or less, Oncor's tariff sets delivery at 5.3843¢ per kWh plus $6.70 a month in customer and metering charges (checked November 12, 2026; charges last revised October 4, 2026). Its riders can change when new tariff rates take effect, and a premise moves to Oncor's demand-billed schedule after a third recorded demand above 10 kW in a rolling 12 months or one above 12 kW. Delivery is billed under Oncor's PUCT-approved tariff, and how delivery, demand and other pass-through charges appear in an offer differs by supplier, so ask us and we'll check each offer.
Source: Oncor Electric Delivery, Tariff for Retail Delivery Service (checked November 12, 2026)
Each Dallas business is quoted its own supply rate, priced on its usage, how steady that usage is and the term, and Oncor's delivery is added to it. Oncor's tariff sets delivery at 5.3843¢ per kWh plus $6.70 a month for an account at 10 kW or less (checked November 12, 2026). The average Texas commercial account paid 8.47¢ per kWh all-in in July 2026 (EIA); a quote pricing supply alone does not compare with it.
Source: Oncor Electric Delivery, Tariff for Retail Delivery Service (checked November 12, 2026)
Source: U.S. Energy Information Administration, Electric Power Monthly, table 5.6.A
Our results open on the lowest estimated cost at your monthly kWh among the offers we show for an address on Oncor's lines. A lower price per kWh can cost more once fees, usage bandwidth and pass-through charges count, and on a demand-billed account peak kW counts too. Compare each offer on the same term and start month: enter your ZIP or send one bill to see them priced side by side.
No separate fee. Your supplier pays us a commission that is included in your quoted rate. It is a per-kWh amount inside the rate the supplier quotes. Voltcheckr LLC is a PUCT-registered broker (BR260102), and the commission is paid by the supplier you choose. You see live supplier rates by ZIP, or send one bill for a quote, and you sign only with the supplier.
In kW, once a premise crosses Oncor's 10 kW line: over 10 kW three times in a rolling 12 months, or once over 12 kW. The larger secondary schedule then bills distribution per kW of the month's highest 15 minutes, and Oncor's 80% ratchet can carry a higher peak from the previous 11 months into it. A power factor under 95% lagging can raise billed kW, and a premise returns after 12 consecutive billing months at or under 10 kW. How demand appears in an offer differs by supplier, so ask us and we'll check each offer.
For a standard account: the service address or ESI ID, one recent bill or your monthly kWh, and the date your contract ends if you have one; a new location on Oncor's lines in Dallas, Irving or Plano is quoted the same way, from projected usage, after the supplier's credit review. Eligibility follows the service address: a site on a municipal utility or electric cooperative that has not opted into retail competition has no retail choice. There is no separate fee for Voltcheckr's service; the supplier you sign with pays the commission.
One bill from your supplier carries two kinds of charge: the supply charge you shop, and Oncor's delivery charges. Oncor owns the wires and meters but does not sell electricity, so it bills delivery to your supplier under its PUCT-approved tariff, and your supplier passes it on with market charges, taxes and fees. How an offer shows Oncor's charges differs by supplier, so ask us and we'll check each offer.
By the account's rate schedule in Oncor's PUCT-approved tariff, and they are not negotiated: no supply contract changes what Oncor charges. A premise at 10 kW or less pays monthly customer and metering charges and a distribution charge per kWh; a larger premise pays distribution on its billed kW. Both pay riders such as the transmission factor (TCRF), the distribution cost factor (DCRF) and the energy efficiency factor (EECRF), and a lower peak can lower a larger premise's billed kW.
Because the PUCT approves changes to Oncor's tariff: base rates after a rate case, and riders such as TCRF and DCRF when they are updated, at times more than once a year. Delivery can move while a fixed supply price does not, so read an offer for which charges it fixes and which it passes through. Oncor's tariff page lists the charges in effect, and the figures on this page carry the date we checked them.
Yes. A commercial account whose service address is delivered by Oncor picks its retail electricity supplier and contract term under Texas competition, and delivery stays with Oncor under its PUCT-approved tariff whichever supplier it signs with. Eligibility follows the utility named on the bill; an address served by a municipal utility or an electric cooperative that has not opted into retail competition does not shop retail suppliers.
No: Oncor Electric Delivery owns the lines and meters, delivers to the addresses on them and restores service after an outage (888-313-4747, any hour); Sempra and Texas Transmission Investment own it. TXU Energy is a separate company, a retail electric provider and one of the suppliers selling to addresses on Oncor's lines. A Dallas business does not have to buy from TXU: whichever supplier it signs with, Oncor delivers the power.
Before the contract's end date. For a small commercial account, one with a peak demand under 50 kW, the provider must send at least three written notices in the last third of a fixed rate contract, the final one at least 14 days before it expires. On a contract with a termination fee, the notice must say that no termination penalty applies in the 14 days before the end date (16 TAC 25.475(e)). A larger account's contract sets its own notice and exit terms. Prices tend to vary by season: the EIA says electricity prices are usually highest in summer, when demand is high. No month is sure to cost less.
Source: PUCT rule 16 TAC 25.475(e), contract expiration notices (PDF). Checked November 23, 2026.
Source: EIA, Electricity explained: prices and factors affecting prices. Checked November 23, 2026.
A retail electric provider, or REP, is the company that sells electricity to retail customers in Texas. PUCT rules define it as a person that sells electric energy to retail customers in this state and may not own or operate generation assets (16 TAC 25.5). A transmission and distribution utility, or TDU, owns or operates the lines that deliver the power. A broker gives a customer advice or procurement services on choosing a REP or a REP's product (16 TAC 25.112). Voltcheckr LLC is a registered broker, BR260102. It is not a REP or a utility and has no affiliated REP.
Source: PUCT, Alphabetical Directory of Retail Electric Providers. Checked November 23, 2026.
Yes, where a supplier quotes one for the account. For a small commercial account, one with a peak demand under 50 kW, the plan's Electricity Facts Label must show the product's renewable percentage and the statewide average (16 TAC 25.475(g)(5)). A provider may call a product renewable only if all of its fuel mix is renewable or the claim reads "x% renewable". Providers can back the figure by retiring renewable energy credits, and one retired credit equals one megawatt-hour generated from renewable resources (16 TAC 25.476). A larger account's renewable terms are in its contract.
Send them in one request. A supplier can price several locations together and put them on one contract, and each address keeps its own meter and its utility's delivery charges. Ask us to price them together and one by one, so you can see which fits. Have each service address ready, and a recent bill for each if you have one.
Source for the average: EIA electricity data
Reviewed November 23, 2026 by Voltcheckr Research.
KEEP EXPLORING
Choice follows the service address and the utility named on the bill, never the city name alone.
Opening a restaurant, usage by business type and nearby markets, each in a short guide.
Find the ESI ID and confirm the address is on Oncor's lines.
The ESI ID is the 17-digit number on a bill for the address. Oncor's ESI ID lookup finds it and shows whether the location is in Oncor's service territory.
With a meter in place, your supplier sends the start order.
Choose a supplier and give it the last 7 digits of the ESI ID. The supplier sends Oncor the move-in order for the start date you agree, and Oncor bills its delivery charges to the supplier, not to you.
With no meter, or new lines needed, request Oncor construction first.
Oncor's new construction request starts the work, and a project manager contacts you within two business days. Oncor's commercial and industrial customer requirements list the load details the request needs, and its New Construction Management Center answers at 888-222-8045. The ESI ID comes when the site is ready, and Oncor installs the meter for the start date you select with your supplier, subject to construction and site access.
Give Oncor the projected load and suppliers the projected usage.
For a new non-residential premise, Oncor sets the first delivery rate schedule from the projected load the customer or builder provides. Its commercial load requirements form asks for the service size in amps, the voltage and the HVAC, motor and lighting loads, usually completed with the electrical contractor. A supplier prices a site with no bills from projected energy use in kWh, and the usage estimator turns square footage and business type into that figure, labelled as an estimate. It does not replace the load details Oncor asks for.
Removing heavy equipment from a space? Ask about a demand reset.
Oncor can reset an existing premise's demand ratchet after a permanent load reduction of at least half its peak billing demand, with the equipment removed and a load study by an independent registered professional engineer or master electrician. The request goes through your supplier and counts for future bills only, and Oncor reinstates the old ratchet if demand reaches 75% of the prior peak within 6 months.
Estimate a new location's usageDemand charge calculator
Sources: Oncor, Existing Service Requests (the ESI ID lookup, the last 7 digits, the supplier's move-in order), New Construction (the request, a project manager within two business days, meters installed for the start date you select) and For Business (the 17-digit ESI ID, the New Construction Management Center); Oncor, Tariff for Retail Delivery Service, section 6.2.3.5 (the first rate schedule from projected load), and its Electric Demand Reset Verification form. Read October 10, 2026. Oncor, Commercial & Industrial Load Requirements form (the service amps, voltage and connected kW). Read November 25, 2026.Official documents: Oncor: commercial and industrial load requirements
Get the kitchen plans approved before you build.
Under Dallas City Code, building or extensively remodeling a food establishment cannot begin until the city approves its plans in writing. Apply on DallasNow with two identical sets of scaled plans showing the equipment layout, room finishes, sinks and drains. Taking over a restaurant? A change of ownership, a major change to how it operates or a renovation needs a new application with the city's Consumer Health Division. Keep the approved equipment list for the electricity quote.
Apply for a new certificate of occupancy.
Dallas requires a new certificate of occupancy for the first use of a space, a change of use or a change of tenant. If the space had a different use before, the city's Building Code and Zoning teams review the application and may ask for a site plan, a floor plan and a parking analysis. If the use is the same, inspections can be scheduled once the application is approved and paid. The certificate is released when all inspections pass.
Line up the city inspection with your start date.
Oncor's Dallas requirements call for a city inspection before Oncor serves a new business tenant, even where the power is already on. The same applies before Oncor sets a first meter. A tenant inspection is valid for 30 days and covers more than one move-in order in that time, so have your supplier ready to send the order inside that window.
Check the address and get quoted before the inspection.
Oncor's ESI ID lookup shows whether the address is in Oncor's service territory. Suppliers price a restaurant that has not opened from projected usage: square footage, seats, hours and equipment. They run a credit review and may ask for a deposit. The supplier you choose takes the last 7 digits of the ESI ID and sends Oncor the move-in order. Coolers and hoods run before opening day, so ask for a term that starts with the first full month of service.
Know what a kitchen's demand can do to the bill.
Ovens, fryers, dishwashers, walk-in coolers and HVAC running together through a dinner rush can set the month's peak. Under Oncor's tariff, a third recorded demand above 10 kW within 12 months, or one above 12 kW, moves the premise to a larger schedule. That schedule bills the distribution charge per kW of billed demand, and Oncor's 80% ratchet can carry a higher peak from the previous 11 months into it. Delivery is billed under Oncor's PUCT-approved tariff, and how delivery, demand and pass-through charges appear in an offer differs by supplier, so ask us and we'll check each offer.
Restaurant electricity in TexasEstimate a new location's usageDemand charge calculatorLoad factor calculator
Sources: Dallas City Code, Section 17-10.2(e). City of Dallas Consumer Health Division, Food Establishment Permit Guidance. City of Dallas, Certificate of Occupancy page and its FAQ (May 2026). Oncor, Dallas Permit and Inspection Requirements (updated May 27, 2026), Existing Service Requests and its tariff. Read November 13, 2026.Official documents: Oncor: Dallas permit and inspection requirements
| Business type | kWh a month | 0.5¢/kWh, a year |
|---|---|---|
| Professional office13.6 kWh per sq ft a year × 3,500 sq ft | 4,000 | $240 |
| Retail store13.7 kWh per sq ft a year × 4,000 sq ft | 4,600 | $276 |
| Hotel14.4 kWh per sq ft a year × 20,000 sq ft | 24,000 | $1,440 |
| Restaurant43.8 kWh per sq ft a year × 3,000 sq ft | 11,000 | $660 |
Estimates from EIA CBECS 2018 intensities at a typical footprint, not a published statistic. The last column is what each 0.5¢ per kWh on the supply rate is worth over a year at that use. Each row is the intensity times the floor area, divided by 12 and rounded to the nearest 100 kWh. Estimate your own space
More business types: Auto Dealerships, Warehouses & storage
These are the PUCT's definitions for a small commercial account, one with a peak demand under 50 kW. Its plan's Electricity Facts Label must say whether the product is a fixed rate or a variable price product. A larger account's contract sets its own terms.
| Product | When the price can change | Rule |
|---|---|---|
| Fixed rate | The price is the same in every billing period of a term of at least three months. It may vary only for actual changes in TDU charges, in ERCOT or Texas Regional Entity administrative fees, or in fees and costs that new or changed laws put on the provider. | 16 TAC 25.475(b)(5) |
| Variable price | The price may vary by a method the provider sets. A month-to-month contract, one with a term of 31 days or less, may not carry a termination fee. | 16 TAC 25.475(b)(7), (b)(11) |
| Indexed | The price follows a disclosed formula based on publicly available indices or information. Not offered to a small commercial account: the rule bars providers, aggregators and brokers from offering one, so it is for larger accounts only. | 16 TAC 25.475(b)(6), (c)(3)(F) |
Source: PUCT rule 16 TAC 25.475, definitions and contract requirements (PDF). Checked November 23, 2026. Source: PUCT rule 16 TAC 25.471(d)(11), small commercial customer (PDF). Checked November 23, 2026.
Compare available rates and terms. Start with your business ZIP.
Need help? Call (469) 708-9311
Voltcheckr LLCPUCT Broker Registration BR260102No separate fee, the supplier pays usBroker disclosures