How we compare
Review energy rates, included charges and contract terms together.
See live Texas rates for your ZIP. Fast. No signup. No obligation.
Voltcheckr LLCPUCT broker BR260102Broker disclosures
Business suppliers we shopAvailability varies by account.
A Texas business’s experience
“Voltcheckr was quick, easy and saved my business thousands!”
BasisProjected, not yet realized. Savings vary by account and market. Details of this projection in the customer story
Mike Owner, On the Rocks Italian Bistro
Burleson, Texas
YOUR NEXT STEP
Have the service address, meter and start date ready, or time a switch to your current end date.
Existing space checklist
Find the service address and utility on an existing bill, and on AEP Texas's lines the ESI ID.
At an address on AEP Texas's lines, choose a supplier and start date. Your supplier sends AEP Texas the start request.
Ask the supplier about credit and deposit requirements before signing.
Review your current terms before choosing a new start date.
Find the end date, notice window and any early termination fee.
Have a recent bill and your ESI ID ready so the offer can be matched to your service address.
Review the new contract and confirm the service date before committing.
Credit review and deposit requirements vary by supplier.
Rates priced for your utility, your renewal month and, with a bill, your usage.
Fixed supply rates, each with its supplier, term and start month. The supplier's contract shows the full terms before you sign.
Pick an emailed rate and sign up on our site with your yearly usage or a recent bill (some plans need the bill). The supplier's contract then comes by email to sign.
Emails start about 90 days before your contract ends, or right away if it is closer, so you can renew before it rolls to a month-to-month rate that can cost more.
Rates in your inbox before you renew. Stop anytime.
Broker disclosure: Voltcheckr LLC is an independent energy broker (Texas PUCT Broker Registration BR260102), not an energy supplier, with no affiliated supplier. The supplier you choose pays us a commission that is included in your quoted rate, and you contract directly with that supplier. You can stop using Voltcheckr at any time at no cost. By continuing you acknowledge our broker disclosures.
McAllen is in Hidalgo County. A business at an address on AEP Texas's lines chooses its retail supplier; one on the lines of Magic Valley Electric Cooperative, which has not opted into retail competition, buys from the cooperative. A space that already has power shows its utility on the last bill, and on AEP Texas's lines its ESI ID too; a new building there gets an ESI ID from AEP Texas. The quote form on this page checks the address.
At an address on AEP Texas's lines, pick a retail electricity supplier and give it the ESI ID, and the supplier sends AEP Texas the start request for the date you choose. A new structure requests service and a meter through AEP Texas's new construction page. Line the start date up with the City's certificate.
A suite or building with no bills yet is priced from a projected figure. The usage estimator turns square footage and business type into one, labelled as an estimate.
The City of McAllen's commercial permit application says the improvements are not occupied until a Certificate of Occupancy has been issued. Building, expanding, moving or changing the occupancy of a building starts with an application to the City's Building Permits and Inspections Department, and electrical permits are pulled by an electrical contractor registered with the City.
On AEP Texas's lines, a retail supplier sets its own credit criteria for a business under 16 TAC 25.478 and may ask for a deposit. The rule caps a home deposit but not a business one, requires interest on it, and refunds it after 24 consecutive billings with no late payment. A Magic Valley Electric Cooperative account follows the cooperative's own deposit terms.
AEP Texas's tariff lists McAllen among the communities it serves. The utility on your bill settles it for your address, and a business on AEP Texas's lines chooses its supplier.
Checked November 23, 2026.
Sources: City of McAllen, Commercial Permit Application (REV. 7/26) and Building Permits; AEP Texas, Start, Stop or Transfer Service and McAllen and Mission; Public Utility Commission of Texas, 16 TAC 25.478. Read November 17, 2026; the City's current commercial permit application read November 26, 2026.
LARGER ENERGY NEEDS
Suppliers bid for your contract on the terms you set. We help you compare the custom prices.
For accounts over 100,000 kWh a year
Need help? Call (469) 708-9311
We review your application and help set your contract terms.
Receive custom prices from suppliers by email as they arrive.
Review the contract with us before you sign.
Eligibility review and authorization are required. Supplier participation varies.
BUSINESS ELECTRICITY
See rates, terms and what’s included, at the same usage.
See how your bill adds upBusinesses in Texas retail-choice areas can choose their electricity supplier. Available offers depend on your service address, usage and contract timing.
| Illustrative comparisonZIP 78501 | Example A12-month term | Example B24-month term |
|---|---|---|
| Fixed energy rate | 6.20¢/kWh | 6.45¢/kWh |
| Energy | $93.00 | $96.75 |
| AEP Texas Central delivery | $66.33 | $66.33 |
| Monthly utility charge | $5.66 | $5.66 |
| Illustrative monthly bill | $164.99 | $168.74 |
| Average price | 11.00¢/kWh | 11.25¢/kWh |
An AEP Texas Central account at 10 kW or less, before taxes. How an offer shows delivery differs by supplier, so ask us and we’ll check each offer.
Updated .
1,500 kWh per month. Example A: an illustrative bill of $164.99, or 11.00 cents per kWh. Example B: an illustrative bill of $168.74, or 11.25 cents per kWh. Before taxes and other account-specific charges.
UNDERSTAND YOUR COSTS
Energy, delivery and the monthly charge: Example A comes to about $164.99 at 1,500 kWh, before taxes and other account-specific charges.
Two parts: the energy rate from the supplier you choose, which you compare here, and AEP Texas Central’s delivery, about 4.42¢ per kWh plus $5.66 a month for accounts at 10 kW or less; about 4.28¢ in the former Oncor McAllen/Mission area.
Cite as: Voltcheckr LLC, AEP Texas Central delivery charges for McAllen businesses at 10 kW or less (AEP Texas Central tariff, checked November 17, 2026), voltcheckr.com/business-electricity/mcallen#mcallen-bill-example.
AEP Texas bills delivery to your supplier, which includes it on your electricity bill. An offer may bundle delivery into its price or list it separately. This example adds the tariff charges below; the monthly charge is separate.
The $5.66 monthly charge includes a $1.45 customer charge and a $4.21 metering charge for one meter. The nuclear decommissioning charge, 0.0174¢ per kWh billed in June only, and the credit for a meter AEP Texas does not own are excluded.
Current delivery charges. Actual pricing and delivery charges vary by account and market.
This example uses AEP Texas’s schedule for secondary-voltage accounts whose peak demand is 10 kW or less this month and has not exceeded 10 kW in any of the previous eleven months.
A month above 10 kW moves the account to AEP Texas’s larger schedule for at least twelve months. That schedule bills a $2.28 customer charge and a $19.72 metering charge a month, and its distribution charge is billed per kW of the month’s highest 15-minute demand. A monthly kWh total alone cannot price that bill; check the demand and service-class lines on your bill.
For a premise that has reached 700 kW, transmission charges can depend on 4CP: its demand during ERCOT’s four summer peaks. This method does not apply to every account above 10 kW.
Multiply monthly usage by the energy and delivery rates, then add the monthly charge. Divide that amount by usage to get the estimated average price per kWh.
Delivery is calculated at 4.4218¢ per kWh. The 6.20¢ energy rate is an illustration, not a live supplier offer. Taxes and any other account-specific charges are excluded. Figures are rounded for display.
Your monthly bill changes with usage, even when the energy rate is fixed. Utility riders can also change when new tariff rates take effect.
Ancillary services, congestion and ERCOT fees may be included in the quoted price or passed through separately. The supplier’s contract identifies which charges are fixed, which can change and how they are calculated.
Taxes and other account-specific fees are excluded from this example. See the Texas business FAQ for answers to common electricity questions.
Example A, a 12-month fixed-rate example. Before taxes and other account-specific charges.
| Bill component | |||
|---|---|---|---|
| Energy | $93.00 | $186.00 | $310.00 |
| Utility delivery | $66.33 | $132.65 | $221.09 |
| Monthly utility charge | $5.66 | $5.66 | $5.66 |
| Illustrative monthly bill | $164.99 | $324.31 | $536.75 |
| Average price | 11.00¢/kWh | 10.81¢/kWh | 10.73¢/kWh |
McAllen electricity choice
If AEP Texas Central delivers to your address, you choose your supplier from those serving its area, and AEP Texas Central still delivers the power.
Options depend on your service address: a business on the lines of Magic Valley Electric Cooperative, which has not opted into retail competition, buys from the cooperative and does not shop retail suppliers.
WHY VOLTCHECKR
Voltcheckr LLC is a Texas PUCT-registered electricity broker (BR260102) with no affiliated supplier.
Review energy rates, included charges and contract terms together.
Start with your ZIP, usage and contract timing.
Look at the energy rate, contract length and what’s included.
Continue online where available, or get help with an offer.
No separate fee. Your supplier pays us a commission that is included in your quoted rate.
How Voltcheckr is paid →We use your bill and usage to prepare your quote, and share them with suppliers only with your authorization. We never sell your data.
Our privacy policy →BY INDUSTRY
See what shapes electricity use in your industry.
BEFORE YOU CHOOSE
Rates, contracts and getting started.
For a small business at 10 kW or less, AEP Texas Central's tariff sets delivery at 4.4218¢ per kWh plus $5.66 a month in customer and metering charges (checked November 17, 2026; charges last revised September 29, 2026); June adds 0.0174¢ for nuclear decommissioning. Its riders can change when new tariff rates take effect, and a month over 10 kW moves an account to the demand schedule for a year. Delivery is billed under AEP Texas Central's PUCT-approved tariff, and how delivery, demand and other pass-through charges appear in an offer differs by supplier, so ask us and we'll check each offer.
Source: AEP Texas, Tariff for Electric Delivery Service (checked November 17, 2026)
Not quite. AEP Texas’s tariff does not apply its system restoration charge, nuclear decommissioning charge or ADFIT credit to customers in the former Oncor McAllen/Mission service area (Docket 49402), which AEP Texas took over from Oncor in 2019, including the Sharyland Plantation community. So a small business there at 10 kW or less pays 4.2786¢ per kWh plus $5.66 a month, against 4.4218¢ plus $5.66 in AEP Texas Central's area (checked November 17, 2026). The riders on your bill show which applies, so ask us and we'll check your account.
Source: AEP Texas, Tariff for Electric Delivery Service (checked November 17, 2026)
Each McAllen business gets its own supply rate, priced on its usage, load shape, term and start month, and it moves with the wholesale market. A published Texas average covers a past month and includes delivery, so it is not a supply quote. The average Texas commercial account paid 8.47¢ per kWh all-in in July 2026 (EIA); a quote pricing supply alone does not compare with it. Enter your ZIP or send one bill to see today's supply offers for your McAllen address, side by side.
Source: U.S. Energy Information Administration, Electric Power Monthly, table 5.6.A
Retail electric providers active in AEP Texas's area serve McAllen businesses on its lines; Magic Valley Electric Cooperative, which has not opted into retail competition, sells to a business on its lines itself. The suppliers we shop for Texas businesses are listed on this page, and availability varies by account. A name on a list is not an offer, so enter your ZIP or send one bill to see which suppliers quote your account.
Compare at your own usage: for a McAllen address on AEP Texas's lines, the results open on the lowest estimated cost among the offers we can show. A lower price per kWh can still cost more once a usage bandwidth, pass-through charges or an early termination fee are counted. Read each offer on the same term and start month, then enter your ZIP or send one bill to see them side by side.
Yes. A commercial account whose service address is delivered by AEP Texas picks its retail electricity supplier and contract term under Texas competition, and delivery stays with AEP Texas under its PUCT-approved tariff whichever supplier it signs with. Eligibility follows the utility named on the bill; an address served by a municipal utility or an electric cooperative that has not opted into retail competition does not shop retail suppliers.
The City of McAllen's commercial permit application says a space is not occupied until a Certificate of Occupancy is issued, and electrical permits are pulled by an electrical contractor registered with the City. On AEP Texas's lines, give your supplier the ESI ID on the last bill, or the one AEP Texas assigns a new building, and your supplier sends AEP Texas the start request. Line the start date up with the certificate.
No separate fee. Your supplier pays us a commission that is included in your quoted rate. It is a per-kWh amount inside the rate the supplier quotes. Voltcheckr LLC is a PUCT-registered broker (BR260102), and the commission is paid by the supplier you choose. You see live supplier rates by ZIP, or send one bill for a quote, and you sign only with the supplier.
If you lease office or retail space, first confirm who holds the electricity account: your business, with its own ESI ID, or the landlord, through a master meter or power included in the rent. Only the account holder can switch, and the lease can still set terms, so read it before you compare. With several suites or locations, ask for one combined bid and separate bids and compare them.
Before the contract's end date. For a small commercial account, one with a peak demand under 50 kW, the provider must send at least three written notices in the last third of a fixed rate contract, the final one at least 14 days before it expires. On a contract with a termination fee, the notice must say that no termination penalty applies in the 14 days before the end date (16 TAC 25.475(e)). A larger account's contract sets its own notice and exit terms. Prices tend to vary by season: the EIA says electricity prices are usually highest in summer, when demand is high. No month is sure to cost less.
Source: PUCT rule 16 TAC 25.475(e), contract expiration notices (PDF). Checked November 23, 2026.
Source: EIA, Electricity explained: prices and factors affecting prices. Checked November 23, 2026.
A retail electric provider, or REP, is the company that sells electricity to retail customers in Texas. PUCT rules define it as a person that sells electric energy to retail customers in this state and may not own or operate generation assets (16 TAC 25.5). A transmission and distribution utility, or TDU, owns or operates the lines that deliver the power. A broker gives a customer advice or procurement services on choosing a REP or a REP's product (16 TAC 25.112). Voltcheckr LLC is a registered broker, BR260102. It is not a REP or a utility and has no affiliated REP.
Source: PUCT, Alphabetical Directory of Retail Electric Providers. Checked November 23, 2026.
Yes, where a supplier quotes one for the account. For a small commercial account, one with a peak demand under 50 kW, the plan's Electricity Facts Label must show the product's renewable percentage and the statewide average (16 TAC 25.475(g)(5)). A provider may call a product renewable only if all of its fuel mix is renewable or the claim reads "x% renewable". Providers can back the figure by retiring renewable energy credits, and one retired credit equals one megawatt-hour generated from renewable resources (16 TAC 25.476). A larger account's renewable terms are in its contract.
Send them in one request. A supplier can price several locations together and put them on one contract, and each address keeps its own meter and its utility's delivery charges. Ask us to price them together and one by one, so you can see which fits. Have each service address ready, and a recent bill for each if you have one.
Source for the average: EIA electricity data
Reviewed November 23, 2026 by Voltcheckr Research.
KEEP EXPLORING
Choice follows the service address and the utility named on the bill, never the city name alone.
Usage by business type and nearby markets, each in a short guide.
Find the service address, ESI ID and utility
McAllen is in Hidalgo County. A business at an address on AEP Texas's lines chooses its retail supplier; one on the lines of Magic Valley Electric Cooperative, which has not opted into retail competition, buys from the cooperative. A space that already has power shows its utility on the last bill, and on AEP Texas's lines its ESI ID too; a new building there gets an ESI ID from AEP Texas. The quote form on this page checks the address.
Get the city's Certificate of Occupancy
The City of McAllen's commercial permit application says the improvements are not occupied until a Certificate of Occupancy has been issued. Building, expanding, moving or changing the occupancy of a building starts with an application to the City's Building Permits and Inspections Department, and electrical permits are pulled by an electrical contractor registered with the City.
Choose a supplier and arrange the start date
At an address on AEP Texas's lines, pick a retail electricity supplier and give it the ESI ID, and the supplier sends AEP Texas the start request for the date you choose. A new structure requests service and a meter through AEP Texas's new construction page. Line the start date up with the City's certificate.
Confirm credit and deposit requirements
On AEP Texas's lines, a retail supplier sets its own credit criteria for a business under 16 TAC 25.478 and may ask for a deposit. The rule caps a home deposit but not a business one, requires interest on it, and refunds it after 24 consecutive billings with no late payment. A Magic Valley Electric Cooperative account follows the cooperative's own deposit terms.
Estimate usage if you do not have a bill
A suite or building with no bills yet is priced from a projected figure. The usage estimator turns square footage and business type into one, labelled as an estimate.
Estimate a new location's usageDemand charge calculator
Sources: City of McAllen, Commercial Permit Application (REV. 7/26) and Building Permits; AEP Texas, Start, Stop or Transfer Service and McAllen and Mission; Public Utility Commission of Texas, 16 TAC 25.478. Read November 17, 2026; the City's current commercial permit application read November 26, 2026.Official documents: City of McAllen: building permitsCity of McAllen: commercial permit applicationAEP Texas: start, stop or transfer serviceAEP Texas: McAllen and Mission
| Business type | kWh a month | 0.5¢/kWh, a year |
|---|---|---|
| Retail store13.7 kWh per sq ft a year × 4,000 sq ft | 4,600 | $276 |
| Medical clinic17.4 kWh per sq ft a year × 5,000 sq ft | 7,300 | $438 |
| Restaurant43.8 kWh per sq ft a year × 3,000 sq ft | 11,000 | $660 |
| Professional office13.6 kWh per sq ft a year × 3,500 sq ft | 4,000 | $240 |
Estimates from EIA CBECS 2018 intensities at a typical footprint, not a published statistic. The last column is what each 0.5¢ per kWh on the supply rate is worth over a year at that use. Each row is the intensity times the floor area, divided by 12 and rounded to the nearest 100 kWh. Estimate your own space
More business types: Warehouses & storage, Places of worship
These are the PUCT's definitions for a small commercial account, one with a peak demand under 50 kW. Its plan's Electricity Facts Label must say whether the product is a fixed rate or a variable price product. A larger account's contract sets its own terms.
| Product | When the price can change | Rule |
|---|---|---|
| Fixed rate | The price is the same in every billing period of a term of at least three months. It may vary only for actual changes in TDU charges, in ERCOT or Texas Regional Entity administrative fees, or in fees and costs that new or changed laws put on the provider. | 16 TAC 25.475(b)(5) |
| Variable price | The price may vary by a method the provider sets. A month-to-month contract, one with a term of 31 days or less, may not carry a termination fee. | 16 TAC 25.475(b)(7), (b)(11) |
| Indexed | The price follows a disclosed formula based on publicly available indices or information. Not offered to a small commercial account: the rule bars providers, aggregators and brokers from offering one, so it is for larger accounts only. | 16 TAC 25.475(b)(6), (c)(3)(F) |
Source: PUCT rule 16 TAC 25.475, definitions and contract requirements (PDF). Checked November 23, 2026. Source: PUCT rule 16 TAC 25.471(d)(11), small commercial customer (PDF). Checked November 23, 2026.
Compare available rates and terms. Start with your business ZIP.
Need help? Call (469) 708-9311
Voltcheckr LLCPUCT Broker Registration BR260102No separate fee, the supplier pays usBroker disclosures