Skip to content
Texas business electricity

Light Manufacturing
Electricity Rates in Texas

Your production schedule shapes your electricity use. Compare supply offers with demand charges, usage conditions and contract timing in view.

Live ratesNo signupNo obligation

Voltcheckr LLCPUCT-registered broker BR260102

Over 100,000 kWh a year?

Suppliers we shop for Texas businesses

See all 16 suppliers →
  • TXU Energy
  • Constellation Energy
  • NRG Energy
  • Shell Energy
  • Engie
  • NextEra Energy
  • AP Gas & Electric
  • BP Energy Retail Company
  • Gridmatic Retail
  • Hudson Energy
  • Major Energy
  • SFE Energy
  • Summer Energy
  • TriEagle Energy
  • Value Power
  • World Kinect

Availability varies by account.

How it works

Compare before you commit.

  1. 01

    Start with your business ZIP.

    Add your usage and when you need service.

  2. 02

    Put the offers side by side.

    Check the rate, contract length and what is included.

  3. 03

    Choose with the terms in view.

    Continue online where available, or get help.

Costs and contracts

What drives a light manufacturer's electricity bill

Tap a row for the detail.

What drives the cost · when you use power

Depending on the account's applicable utility tariff and its contract, a manufacturing operation can be billed for peak demand, where the highest 15-minute interval of the month can set the demand charge for the entire month. Compressors, motors and process heat running together can raise that interval; a startup surge lasting seconds moves a 15-minute average far less. Second and third shifts can make time-of-use pricing worth comparing.

How to control it · contract and timing

Compare structures on the same usage forecast, start month and term: a fixed supply price holds the rate, while index pricing, which Texas rules bar for small commercial accounts, passes market moves through to you, so a larger account chooses by budget and risk tolerance. Base demand decisions on your measured interval usage and your utility's tariff, and have a qualified specialist review how equipment comes online. Ask suppliers to price your actual shift schedule; a night-shift-heavy operation can come out ahead on a time-of-use structure.

Delivery charges · your utility's tariff

In Texas retail-choice territory your delivery utility sets these under its PUCT-approved tariff, and your supplier bills them. How delivery, demand and pass-through charges appear in an offer differs by supplier, so ask us and we'll check each offer.

Contract timing · shop 6 to 12 months out

Start watching your renewal about 18 months before the contract ends and shop it 6 to 12 months out, since suppliers can price a contract to start months ahead. The renewal reminder on this page starts its emails about 90 days out, a backstop before the account can lapse. If a term ends with no new contract, the account usually moves to the supplier's month-to-month rate, often called a holdover rate, until you sign again.

Manufacturing by type

TypeWhat to know when you compare
Machining or fabricationShifts, motors and compressed air
AssemblyShifts, conveyors, lighting and cooling
Food productionRefrigeration and process heat, and whether that heat runs on gas or electricity

Reverse Auction

For accounts over 100,000 kWh a year

  1. We set it up with you

    Voltcheckr reviews your application and usually contacts you within the hour, 7am–7pm CT, Monday–Saturday, to set up the terms you want.

  2. Suppliers bid head to head

    You get each bid by email as it comes in, usually over 4 to 5 business days, and offers tend to improve, most often on the last day.

  3. Pick the winning bid

    Voltcheckr goes over that supplier's contract terms with you before you sign.

Need help? Call (469) 708-9311

Who does what

Why use a broker?

You choose the supplier. Your utility continues delivering power.

How we're paid

No separate fee: suppliers pay us a commission when a contract is signed.

Why use Voltcheckr

Bring your comparison into one place. We help you review available supplier offers, check what each includes and understand the terms before you choose.

How we handle data

We use your bill and usage to prepare your quote, and share them with suppliers only with your authorization. We never sell your data.

Texas focus

Check who serves your address.

Choice follows the service address and the utility named on the bill, never the city name alone.

Greater HoustonCenterPoint delivers
Dallas and Fort WorthOncor delivers
MidlandOncor delivers
Still under contract?

Renewal Reminder

  • Custom Rates

    Rates priced for your utility, your renewal month and, with a bill, your usage.

  • Clear Terms

    Fixed supply rates, each with its supplier, term and start month. No supplier conditions attached.

  • Sign Up Online

    Pick an emailed rate and sign up on our site with your yearly usage or a recent bill (some plans need the bill). The supplier's contract then comes by email to sign.

  • Right on Time

    Emails start about 90 days before your contract ends, or right away if it is closer, so you can renew before it rolls to a month-to-month rate that can cost more.

Rates in your inbox before you renew. Stop anytime.

Broker disclosure: Voltcheckr LLC is an independent energy broker (Texas PUCT Broker Registration BR260102), not an energy supplier, with no affiliated supplier. The supplier you choose pays us a referral commission, and you contract directly with that supplier. You can stop using Voltcheckr at any time at no cost. By continuing you acknowledge our broker disclosures.

Manufacturing electricity questions

What does it cost to use Voltcheckr?

No separate fee: suppliers pay us a commission when a contract is signed. It is a per-kWh amount inside the rate the supplier quotes. Voltcheckr LLC is a PUCT-registered broker (BR260102), and the commission is paid by the supplier you choose. You see live supplier rates by ZIP, or send one bill for a quote, and you sign only with the supplier.

What do Texas businesses pay for electricity on average?

The average Texas commercial account paid 8.47¢ per kWh all-in, supply and delivery together, versus 14.53¢ nationally (EIA, 07/2026), and used about 9,701 kWh a month (EIA, through 2026). Supplier quotes may price supply alone, so they are not always directly comparable to that all-in average. That usage average mixes corner stores with hospitals, so any one business varies widely. Businesses in deregulated Texas territory choose their electricity supplier, and delivery stays with the local TDU with any supplier.

How much electricity does a Texas light manufacturer use?

Roughly 20,000 to 100,000 kWh a month, depending on size and hours (our estimate, not a published statistic). Light manufacturing operations in Texas run machinery, compressed air systems, and process heating and cooling that create large, often predictable electricity loads where a small difference per kWh adds up to a large amount over a year.

Can a light manufacturer in Texas choose its electricity supplier?

Yes, in deregulated ERCOT territory, which covers most of Dallas, Fort Worth, Houston and much of the state. Eligibility follows the service address and its utility: a municipal utility or an electric cooperative that has not opted into retail competition, such as Austin Energy or CPS Energy in San Antonio, does not offer that choice. Voltcheckr LLC (PUCT broker BR260102) shops the supply contract for you and charges no separate fee; the supplier you choose pays the commission.

When do suppliers need interval data?

Interval data shows when and how hard the plant runs, which shapes supplier pricing, and custom pricing for a larger account may ask for it. A recent bill starts the comparison; interval data can follow with your written authorization.

Does adding a production line change my contract?

It can. Some supplier contracts set limits on how far usage can move, and usage outside them can change what you pay. Share planned changes before you sign, and check how the contract treats them.

Can my business get a sales tax exemption on electricity?

Possibly, if the meter mainly powers manufacturing or processing. Texas exempts electricity used that way, and a meter serving both exempt and taxable uses is exempt or taxed as a whole by its predominant use. That use is shown by a utility study of 12 consecutive months, certified by an engineer and kept on file at the plant; you then give your supplier a Texas sales tax exemption certificate. Your tax advisor confirms whether a meter qualifies.

How long does a quote take after I send a request?

Where the ZIP is in Texas retail-choice territory and live plans match your account, your plan options arrive by email within an hour; where none match, the account is priced by custom quote. Custom pricing is prepared the same business day when you ask inside advisor hours (7am–7pm CT, Monday–Saturday), otherwise the next business day.

See what Texas suppliers offer your light manufacturer

Compare available rates and terms. Start with your business ZIP.

Compare business rates →

Need help? Call (469) 708-9311

Voltcheckr LLC · PUCT Broker Registration BR260102 · No separate fee, the supplier pays us